Indestera

Metals, foundry and heavy industry

Efficient energy, a strong line.

In heavy industry, energy is one of the largest cost items and every machine is critical. Indestera's agents manage power demand, machine health and spare part stock together, so costs fall and production runs at full speed.

Gains

Lower cost, higher capacity.

Lower peak costs

Deferrable loads are shifted outside the peak window while the production plan runs as is.

Machines that run longer

Maintenance needs of presses, furnaces and compressors are identified early.

Critical parts always on the shelf

Spare part stock is tracked against usage, so purchasing starts on time.

Featured scenario

Energy and facilities

Power limits kept during peak hours

When demand approaches the contracted power, the agent finds deferrable loads and the facility manager approves the plan on one screen.

Flow · Energy and facilities
Energy peak flow in Studio: power demand signal from the main switchboard, load profile, tariff, energy agent, load plan, load policy, facility manager approval, cooling set point, compressor sequence and savings record
  1. 01Demand approaches the limit
  2. 02Load profile and tariff are reviewed
  3. 03The agent identifies deferrable loads
  4. 04The setting change needs approval
  5. 05The facility manager approves
  6. 06Cooling and compressors are adjusted
  7. 07The saving is recorded
  1. Today

    When a peak warning comes in, people phone around to find which loads can move; a late decision means paying a penalty.

  2. With Indestera

    The agent assesses the load profile and tariff and prepares a load plan for chillers and compressors; on approval the set-points are written safely.

  3. Result

    Peak costs fall and the production plan runs as is; every saving is recorded.

Load shift approval in Engage: site, current demand, contracted power, peak window, proposed plan and estimated saving

A day in the life

A summer evening at a foundry

As peak hours approach, energy and maintenance decisions are made on time.

  1. 16:45

    Main switchboard

    Demand approaches the contracted power; the peak window starts in fifteen minutes.

  2. 16:46

    Energy agent

    Assesses the last seven days' load profile and the tariff, and prepares a load plan for chillers and compressors.

  3. 16:50

    Facility manager

    Reviews the plan on the phone and approves it.

  4. 16:51

    Edge

    The set-points are written, the machines confirm and the saving is recorded.

  5. 20:05

    Maintenance agent

    Sees Press 2's vibration trend in the end-of-day data and adds the maintenance proposal and the bearing to the morning plan.

Press 2 maintenance approval task on a phone in Engage: vibration value, limit, likely cause and proposed speed

ExampleThis story is an illustrative scenario; names and values are representative.

Let's build your first agent together.

In thirty minutes we take one of your processes, build an agent tailored to it and show it running.

Book a demo